Sunday, November 7, 2010

Best Ammo For A Marlin 30-30

.1 termination of activity in the construction and maintenance of concrete, reinforced concrete and prestressed concrete structures in Switzerland

automatic iron detector
Hans Joachim Badzong had developed in his career, in addition to the routine work a decidedly energetic pioneer spirit which enabled him to own developments and implemented inventions into reality. including in particular electronic measuring and testing equipment and procedures, concrete, reinforced concrete and prestressed concrete structures.



8-cell corrosion detection device
Because all are actually electrochemical processes in the nature of processes involved, the effectiveness of which are characterized by potential differences, it was easy to detect such potential differences by measurement by measuring electrodes and using appropriate evaluation procedures Project Design implement. For such an efficient collection, analysis and presentation of a variety of metrics specialized programs have been developed with fellow programmers, that could be greatly simplify the project design.
As a specialist in this field were his investigation team, which includes his son Oliver was one confided extensive measurements on concrete and reinforced concrete structures in building construction, civil engineering and bridge building.

control system for chloride removal of contaminated concrete structures
a
Viaduct in Switzerland
is the top of its development activity was a elektroƧhemisches realkalisation and desalination processes. An emission contaminated concrete surfaces foam mats were laid out with stainless steel inserts and flooded with water. Created After saturation of the concrete top layer of this mat anode direct current and the reinforcing steel in concrete as a cathode were grounded with the earth. Between cathode and anode, the current began to flow and took the pollutants kindly piggyback with them while taking part in the outer side disposed in the drain were.


Hans Joachim has put very substantial financial resources in this promising development, and convinced two friends to help him with other agents. The cost for the entire project with technical know how was immensely analysis with all electrical and electrochemical procedures and, all the tests, equipment, machinery, process equipment, process optimization and trial runs. This was all the more possible, as a paid market strategy analysis had shown that success will occur with high probability. In 2002, the Swiss patent for this technology called CH method granted. Due to the market analysis, a Swiss construction company in Zurich, the method of Hans Joachim acquired.
with a contracted investment of 10 SFr. per treated concrete surface expected Hans Joachim replacement and compensation for his investments and those of his friends. A relevant contract on the part of the company is still pending.

0 comments:

Post a Comment